EcoVadis evidence check · free

Your EcoVadis evidence, checked before you submit it.

Drop the questionnaire export from your EcoVadis account. In seconds you see your questions by theme, the files attached, last cycle’s rejections and the certificates running out.

Drop your EcoVadis questionnaire export

One .xlsx from the export button on your questionnaire · up to 10 MB

Questions, by theme

0

Files attached

0

Rejected last cycle

0

    Validity passed or within 90 days

    0

      Get the full check on every file, with the fix for each →Your private workspace opens with this export already in it.

      This step reads the file for the counts and lets it go. Your workspace keeps files once you sign up.

      1. 01Drop the exportThe counts appear on this page in seconds.
      2. 02Open your workspaceCompany name and work email. The sign-in link comes by email.
      3. 03Work on it in Claude or ChatGPTAdd ClimateFluent once and your assistant opens the files in your workspace. How it works.

      Why here · the rules, then your assistant

      EcoVadis’s document rules, run on every file. Then your own assistant works the pile.

      Upload a file and the workspace reads its dates and your company name, then runs ClimateFluent’s document rules on it. Add ClimateFluent to Claude or ChatGPT and the same project opens there: the register, the failed rules, the page to cite.

      A chat with a pasted file

      • Reads the one file you paste, in that chat.
      • Applies whatever it remembers of the document guide.
      • The chat ends; the finding goes with it.

      A consultant’s review

      • Reads your pile against their own checklist.
      • A gap list and a plan in a report.
      • Repeated by hand next cycle.

      Workspace + plugin

      • Rules R1 to R12 from EcoVadis’s Complete Document Guide, run as code on every file, each with its fix.
      • One register per company: file, rule result, page cited, gate, owner. The next cycle starts from the documents still in force.
      • The same project open in Claude or ChatGPT: it reads a file from the register, checks it against the rules, records the page and the quote.
      1. R4 · R5Dated and in forceIssue, review and expiry dates are read from the file. The validity window follows the document kind: a certificate by its printed expiry, a report by the year of its figures. Expiry within 90 days is flagged.
      2. R2Your company’s nameThe legal name or an alias must appear on the document. A file without it is held back until a version with the name goes in.
      3. R1 · R6One document, readable, completeMerged files, scans with no text layer, password-protected files and lone annexes are caught before EcoVadis sees them.
      4. R9 · 55 uploadsLinked with a pageEach file is attached to the question it proves, with the page number. The summary counts new uploads this cycle against the 55 allowed.

      Then · in Claude or ChatGPT

      Your evidence, open in Claude or ChatGPT.

      Add ClimateFluent to your assistant once. It reads the files in your workspace and works through each question code with EcoVadis’s own document guide: what the file must show, the page that shows it, and the next action.

      1. 01Upload your files hereOpen your workspace below. It keeps every file you add.
      2. 02Add ClimateFluentClaude: Customize → Connectors → Add custom connector. ChatGPT: Plugins → Add custom MCP server. Paste this address: https://climatefluent.com/mcp
      3. 03Ask“Open my EcoVadis project and tell me which files to fix first.”

      Setup screen by screen, for both assistants →

      02 · The full check

      Get the full check on every file

      ClimateFluent checks every file in your export against EcoVadis’s own document guide. Here is what a result looks like.

      Full check · four filesSample · invented files
      1. Energy report FY23.pdfFigures from 2023RejectedR4 · ValidityUpload the latest year: reported figures count for two years.
      2. Environmental policy.pdfCommitments, no target with a numberFix firstN5 · TargetsAdd one target with a number, a baseline year and a target year.
      3. Code of conduct draft.docxMarked draft, no approval dateRejectedR5 · DatedUpload the approved version with its issue date.
      4. ISO 14001 certificate.pdfIn date, covers every siteUpload firstPasses the document rulesLink it to the certification answer, with the page.
      Your result also shows what to upload first, what companies of your sector and size are asked for, and policy templates to adapt, sign and date.

      First EcoVadis rating, asked by a buyer? Tell us who asked and the due date. An advisor replies within five working days.

      Design mock · invented data

      03 · After sign-up

      Your first result, on one screen

      A minute after the export goes in: what to fix, what to upload first, and an advisor’s review one click away.

      Demo Co. · 2026 cycleSummaryQuestionsDocumentsPlan

      Your first result

      31 of 74 questions have a document in the workspace. 6 files to fix or replace, 14 actions in the plan.

      Get your evidence reviewed

      An advisor reads the 6 files to fix and the 14 actions in your plan, and replies in writing with what to change before you submit. Reply within five working days.

      Ask for a reviewBook a 20-minute call

      Start with these 5

      1. ENV200The document had expired; upload the version in forceQuick wins · effort 1 · EHS manager
      2. LAB100The document was not signed; upload a signed copyQuick wins · effort 1 · HR head
      3. SUP100The company’s name was missing; upload a version that names the companyQuick wins · effort 1 · Purchase head
      4. ENV630The document did not cover all sites; extend it or add the missing sitesStrategic · effort 2 · Plant head
      5. GEN300Add a dated, measurable targetStrategic · effort 3 · Company secretary

      Files likely to be rejected 6

      FileQuestionFix
      Energy report FY23.pdfENV200Upload the latest year’s figures.
      HR policy manual.pdfLAB100Upload the signed, dated copy.
      Supplier code v2.docxSUP100Upload the version with the company’s name.

      Companies like you

      • A Scope 1 and 2 figure built from electricity bills and fuel invoices
      • A valid consent to operate with the latest monitoring reports
      • A supplier code of conduct signed back by key suppliers

      Textiles, 250 to 999 staff, India: a seed list from public sources

      Policy templates to adapt

      • Environmental policy · ENV100, ENV200
      • Supplier code of conduct · SUP100, SUP300

      Skeletons in our words. Each becomes evidence once your company adopts, signs and dates it.

      Run this in-house

      Week 5 of the November cohort is EcoVadis: methodology, evidence and the corrective plan, on Demo Co.’s files. Starts Thursday 12 November 2026.

      ₹40,000 + GST

      See the cohort →

      04 · Learn it

      Learn to do this yourself

      Weeks 5 and 6 of the November cohort teach you to build this check. Starts Thursday 12 November 2026, live on Thursday and Sunday evenings, India time.

      Week 5 · with Aayush Anand

      EcoVadis by hand

      Methodology and the 2026 changes. Evidence standards, and spotting which documents get rejected. A 40-document pile mapped to the criteria by hand, against the clock.

      Week 6 · four agents

      EcoVadis with four agents, one per theme

      Agents that map a document pile to the criteria and flag rejection risk per file. The agent files are yours to keep.

      05 · Good to know